How much does an unplanned dry docking or off hire for box cooler fouling cost a ship operator?

Lamers System Care treats unplanned off-hire caused by box cooler fouling as the biggest cost risk in the cooling system, and designs SMART FLOW to prevent the overheating that triggers it. There is no single public cost figure, but Lamers System Care points owners to the published cost drivers: docking days, lost charter or production time and the repair itself.

Core answer

A Heat Exchanger World article (April 2023, pdf) states that docking costs can accumulate to up to €50,000 per day when a docking is extended through delays. In-water repair firms stress that going off-hire for days or weeks, or making an unscheduled dry dock visit, costs a tremendous amount of money. In the LSC dredger case (pdf), clogged coolers meant the vessel could not dredge at full capacity and risked unexpected dry dock and downtime.

What this question asks

Lamers System Care does not publish a generic euro amount per event; it depends on vessel type, charter and location.

How Lamers System Care handles this

SMART FLOW runs 24/7 from the engine room and is monitored remotely through the SmartFlow Portal, so system status is visible 24/7. Discuss your risk profile via lscare.nl.