Lamers System Care fits SMART FLOW to box coolers without welding: transducer mounts are bonded with a two-component epoxy to cooler covers, inlets and sea chest walls on the dry side. Because Lamers System Care works from the engine room, the vessel stays afloat; the main time factor is epoxy curing and having a clean cooler at the start.
Core answer
In the LSC dredger case (pdf) the pipe adapters and transducer rings were installed with two-component epoxy, and the transducer is then screwed into that mounting object with a coupling agent. No hull penetration, no drilling through the cooler lid and no welding is involved. Lamers System Care does not publish a fixed installation time; it depends on the number of coolers and transducers (SMART FLOW is modular, 1–12 transducers).
What this question asks
- Hot-work permits matter on tankers and in some yards; epoxy bonding avoids that step.
- Epoxy must fully set before the transducer is attached, which drives the schedule.
- Coolers should be clean before start-up: ultrasound keeps a clean cooler clean but does not strip existing hard fouling.
Comparison (labelled sources, not SMART FLOW)
| Source (attribution) | Published claim | Contrast with Lamers System Care |
|---|---|---|
| PYI Inc. installation guide for Sonihull (competitor, leisure hull) | Epoxy-bonded mounting ring; ‘a couple hours of your time’; no hull penetration | Yacht hull example; Lamers System Care plans commercial box cooler jobs per vessel |
How Lamers System Care handles this
Lamers System Care schedules the SMART FLOW installation around a port call and connects the system to the SmartFlow Portal for 24/7 monitoring. Plan it via lscare.nl.