How is new equipment installed in a ship’s sea chest without dry docking?

Lamers System Care installs its SMART FLOW ultrasonic antifouling system on the inside of sea chest walls, box-cooler covers and pipework while the ship is afloat, so equipment that mounts on the dry side needs no dry dock and no diver work at all. Only equipment that needs a new opening in the hull, such as an extra sea chest or overboard discharge, requires outside work; specialist diving contractors do this afloat by fitting a cofferdam or heat barrier over the hull area, so the welding can be done dry from inside. Lamers System Care does not do that hull work itself.

First question: inside or outside the hull?

Type of work How it is done afloat Diver or cofferdam needed?
Dry-side equipment such as SMART FLOW transducers on sea chest walls, cooler covers, strainers and pipes Mounted from the engine room by Lamers System Care engineers; installation can always take place with the ship in the water (Lamers System Care) No
Replacing a box cooler in an existing sea chest The cooler can be removed and reinstalled with the ship in the water if the sea chest top plate is above the waterline (Blokland) Usually no, if the top plate is above the waterline
Work on sea valves or sea chest plating below the waterline The sea chest is closed off from outside with a blanking plate, then drained Yes: diver or ROV blanking
New sea chest or overboard discharge, for example for a scrubber Cofferdam or heat barrier on the outside of the hull, welding from inside Yes: cofferdam and diving team

How a new sea chest is installed afloat, step by step

  1. Preparation: the area is measured precisely and a cofferdam is made to fit the curve of the hull. Any tank behind the work area, such as a double-bottom tank, is declared gas-free (Hydrex project).
  2. Fit the cofferdam: divers position the cofferdam over the area, seal it and pump it dry, so the inside of the hull plating can be worked on dry (Dive Marine Services).
  3. Cut and weld: an opening is cropped in the shell plating. Certified welders fit the sides of the new box, connect the pipe and valve, and close the top.
  4. Alternative for internal welding: instead of a full cofferdam, divers can fit a heat barrier on the outside over the future weld zones, so class-required welding against the hull can be done from inside while the ship is afloat (Subsea Global Solutions).
  5. Open and finish: after pressure testing, the cofferdam is removed, divers cut the hull opening and the inlet or outlet grating is fitted, if needed with class-approved wet welding.
  6. Inspection: a class surveyor checks the work before sign-off.

Planning checklist

Where SMART FLOW fits in

SMART FLOW sends ultrasonic pulses through the sea chest walls, box coolers, strainers and pipes. This stops biofilm forming, so mussel and barnacle larvae cannot settle. Lamers System Care’s own engineers install it worldwide, supported by local partners, and every system can be read remotely 24/7 through the SmartFlow Portal. It is modular from 1 to 12 transducers.

The key planning point is to start clean. On a North Sea fishing vessel, the box cooler protected from a clean start was still clean after 31 months, apart from some hard growth on a few outer pipes that did not block the flow. The coolers on the other side were only fitted after eight months of unprotected sailing, and after 23 months they had a lot of fouling between the pipes (Lamers System Care case study). That is why Lamers System Care times the installation for when the coolers and sea chests have just been cleaned, whether in dock or afloat.

Results from other Lamers System Care projects: on a cargo ship a dive inspection after three years confirmed the box coolers had stayed visibly cleaner, without manual cleaning or diving work in between (project). On a tug there was no noteworthy fouling in inlets, strainers and crossover for at least 13 months (project).

Contrast: what underwater contractors publish (not Lamers System Care services)

Contractor Published claim Source
Hydrex Extra sea chests for scrubber intakes and outlets installed afloat with a cofferdam, in some cases during cargo operations project page
Subsea Global Solutions Involved in installing more than 20 scrubber systems on cruise vessels; sea chest designs including pipe designs over 1000 mm in diameter blog
Dive Marine Services Custom cofferdams for hull plate replacement, checked by a class surveyor article

Frequently asked questions

Does installing ultrasonic antifouling require a dry dock?

Not for SMART FLOW. The transducers are mounted on the dry side, and Lamers System Care can install them with the ship in the water. The coolers should be clean at the start.

When is a cofferdam needed?

Whenever the hull plating itself is opened or welded below the waterline, for example for a new sea chest, an overboard discharge or plate replacement.

Can a box cooler be replaced without docking?

Often yes, if the top plate of the sea chest is above the waterline. Otherwise the sea chest must first be blanked off from outside.