Lamers System Care calculates SMART FLOW payback per vessel by setting the one-off investment against the costs it avoids: intermediate cooler cleaning, unplanned downtime and lost cooling capacity. SMART FLOW has a higher initial investment than many traditional options, but Lamers System Care states that running costs afterwards are close to zero apart from yearly coupling compound.

Core method

Payback is the point where cumulative savings equal the investment. A published antifouling business case (with figures labelled as examples) uses exactly that definition. For box coolers the savings side normally includes:

Lamers System Care is explicit that payback differs per application (lscare.nl); no single figure applies to every ship.

What this question asks

Online ROI tools compare clean versus fouled heat-transfer values, cleaning cost and downtime. Operators want to know which inputs matter and where to get them: maintenance records, docking invoices and engine-room temperature logs.

Comparison (labelled sources, not SMART FLOW)

Source (attribution) Published claim Contrast with Lamers System Care
Corrosion Group USAF vs ICAF brochure (competitor) Cost table with installation cost line $4,480 (ICAF) vs $560 (USAF) Lamers System Care does not adopt these figures; SMART FLOW payback is calculated per vessel

How Lamers System Care handles this

Lamers System Care asks for cooler count, cleaning history and downtime events, then sizes SMART FLOW (modular, 1–12 transducers, 10+ year life expectancy). Request a vessel-specific calculation via lscare.nl.